Join the MRA | Member Login
Find a Professional
  • Why Metal Roofing?
    • About MRA
    • Benefits of Metal Roofing
    • Compare Roofing Materials
    • Homeowner Testimonials
    • Inspiring Metal Roofing Projects
  • Homeowner Resources
    • Metal Roofing Buyers Guide
    • Resilient Housing Guide
    • Metal Roof Sustainability Guide
    • Above All Else You Need a New Roof eBook
    • MRA News
    • Member Provided Resources
    • 3rd Party Articles
    • Frequently Asked Questions
    • Preparing for Hurricane Season
  • Gallery
  • Visualizer
  • Ask The Experts
    • Energy Efficiency
    • Existing Metal Roof Questions
    • Installation
    • Is A Metal Roof Right For My House
    • Metal Roofing Benefits
    • Product Selection
    • Other
    • Archive
  • Find a Professional
Join the MRA Member Login
Sign Up Log In Add New Topic

TOPIC: Installation Process

installation of ribbed metal roof

Return to Installation Process

Return to Archive

Return to Forum

This topic has been closed by the administrator. Comments are no longer accepted.
I am in the process of placing Master rib corrugated roofing on my home. I need to cut several pieces to fit into the valleys where the roof comes together. What is the best way for a do-it-yourselfer to cut the material without deforming it or killing myself?
Guest User

6/21/2004
Share
Or copy this URL: https://www.metalroofing.com/spirit/comment/3278/find/
If you have a fair amount to cut then go to a rental place and rent a hand held tool called a "nibbler". Failing that use a left and right set of metal snips simutainously and cut a 1" piece out about a 1/2" away from the final cut. This will roll the metal out of the way and then allow you to trim to the final cut line. Last option is to buy a meatl blade and with a skill saw cut the sheet from the back again a 1/2" away from the line. Watch the hot metal and keep it off the sheet. A sawed edge will rust where a snipped edge will not as the metalic coating is wiped over the edge of the raw steel to protect it. Hope this helps.
Allan Reid
Dura-Loc Roofing Systems, Inc.

6/22/2004
Share
Or copy this URL: https://www.metalroofing.com/spirit/comment/3279/find/
I have helped put a metal roof on with screws in the flats and also helped another person with screws in the ridge. What is the best way? Everyone has a different opinion.
Guest User

6/27/2004
Share
Or copy this URL: https://www.metalroofing.com/spirit/comment/3280/find/
The best way is contact the manufacturer and get their reccomendations. Having said that, some of the generic vertical ribbed panels can be installed either way. One must take into account the sheet length, slope and quality of fastener. Fastening yhen on top of the rib allows the sheets to expand and contract without stressing the fastener as much so on longer sheets it is a much better method. Having the screws on the top keep them out of the water channels which reduces the odds on having a leak from fastener failure and last is that the top location is in a much stronger section of the sheet and it helps elliminate telegraphing of an uneven substrate and dimpling from over driving of the screws.
Allan Reid
Dura-Loc Roofing Systems, Inc.

6/28/2004
Share
Or copy this URL: https://www.metalroofing.com/spirit/comment/3281/find/
  • About the MRA
    • Member Companies
    • Leadership
    • MRA News
  • For Professionals
    • Join the MRA
    • Industry Resources
    • Upcoming Events
  • Contact
  • Subscribe
©2023 Metal Roofing Alliance. All Rights Reserved. Privacy Policy Terms and Conditions