Join the MRA | Member Login
Find a Professional
  • Why Metal Roofing?
    • About MRA
    • Benefits of Metal Roofing
    • Compare Roofing Materials
    • Homeowner Testimonials
    • Inspiring Metal Roofing Projects
  • Homeowner Resources
    • Metal Roofing Buyers Guide
    • Resilient Housing Guide
    • Metal Roof Sustainability Guide
    • Above All Else You Need a New Roof eBook
    • MRA News
    • Member Provided Resources
    • 3rd Party Articles
    • Frequently Asked Questions
    • Preparing for Hurricane Season
  • Gallery
  • Visualizer
  • Ask The Experts
    • Energy Efficiency
    • Existing Metal Roof Questions
    • Installation
    • Is A Metal Roof Right For My House
    • Metal Roofing Benefits
    • Product Selection
    • Other
    • Archive
  • Find a Professional
Join the MRA Member Login
Sign Up Log In Add New Topic

TOPIC: Roof Pitch

Metal roof over rubber membrane?

Return to Roof Pitch

Return to Archive

Return to Forum

This topic has been closed by the administrator. Comments are no longer accepted.
When I added on to our house 2 years ago the pitch of our addition was too low for shingles, so the contractor installed a rubber membrane. Since then I've had to repair the roof a number of times due to punctures from branches. I'm thinking of having a metal roof installed - would the old rubber membrane need to be removed, or would it serve as an water membrane? Thanks, Karl.
Karl Moss

9/19/2003
Share
Or copy this URL: https://www.metalroofing.com/spirit/comment/2261/find/
Provided that you choose a system that can mount on strapping such that you get a stand off for ventilation and good fastening you should be fine. The new building code mandates a minimum of 1" vented air space over the insulation and under the roof covering.
Allan Reid
Dura-Loc Roofing Systems, Inc.

9/20/2003
Share
Or copy this URL: https://www.metalroofing.com/spirit/comment/2262/find/
The rubber membrane covers traditional plywood sheathing with a vented air space below (and above the insulation). The roof is constructed with 2x8 ceiling joists. From what you are saying, it sounds OK to install directly over the rubber membrane. The pitch of the roof is a about 1.25:12
Guest User

9/23/2003
Share
Or copy this URL: https://www.metalroofing.com/spirit/comment/2263/find/
With a vented attic space below the insulation you should be fine to go over the membrane. Good Luck.
Allan Reid
Dura-Loc Roofing Systems, Inc.

9/23/2003
Share
Or copy this URL: https://www.metalroofing.com/spirit/comment/2264/find/
  • About the MRA
    • Member Companies
    • Leadership
    • MRA News
  • For Professionals
    • Join the MRA
    • Industry Resources
    • Upcoming Events
  • Contact
  • Subscribe
©2018 Metal Roofing Alliance. All Rights Reserved. Privacy Policy Terms and Conditions