For Professionals | Member Login
Find a Professional
  • About Us
    • Member Companies
    • Leadership
    • MRA News
    • Homeowner Testimonials
    • Contact the MRA
    • For Professionals
  • Why Metal Roofing?
    • Benefits and Performance of Metal Roofing
    • Compare Roofing Materials
  • Homeowner Resources
    • Metal Roofing Buyers Guide
    • Metal Resilient Guide
    • Metal Roof Sustainability Guide
    • Above All Else You Need a New Roof eBook
    • Today’s Homeowner Partnership
    • Metal Roofing Visualizer
    • MRA University
    • Member Provided Resources
    • Frequently Asked Questions
    • Inspirational Metal Roofing Projects
    • Upcoming Events
  • Gallery
  • Ask The Experts
    • Energy Efficiency
    • I Have An Existing Metal Roof and Have A Question
    • Installation
    • Is A Metal Roof Right For My House
    • Metal Roofing Benefits
    • Product Selection
    • Other
    • Archive
  • Find a Professional
For Professionals Member Login
Sign Up Log In Add New Topic

TOPIC: Roof Pitch

Metal roof over rubber membrane?

Return to Roof Pitch

Return to Archive

Return to Forum

This topic has been closed by the administrator. Comments are no longer accepted.
When I added on to our house 2 years ago the pitch of our addition was too low for shingles, so the contractor installed a rubber membrane. Since then I've had to repair the roof a number of times due to punctures from branches. I'm thinking of having a metal roof installed - would the old rubber membrane need to be removed, or would it serve as an water membrane? Thanks, Karl.
Karl Moss

9/19/2003
Share
Or copy this URL: https://www.metalroofing.com/spirit/comment/2261/find/
Provided that you choose a system that can mount on strapping such that you get a stand off for ventilation and good fastening you should be fine. The new building code mandates a minimum of 1" vented air space over the insulation and under the roof covering.
Allan Reid
Dura-Loc Roofing Systems, Inc.

9/20/2003
Share
Or copy this URL: https://www.metalroofing.com/spirit/comment/2262/find/
The rubber membrane covers traditional plywood sheathing with a vented air space below (and above the insulation). The roof is constructed with 2x8 ceiling joists. From what you are saying, it sounds OK to install directly over the rubber membrane. The pitch of the roof is a about 1.25:12
Guest User

9/23/2003
Share
Or copy this URL: https://www.metalroofing.com/spirit/comment/2263/find/
With a vented attic space below the insulation you should be fine to go over the membrane. Good Luck.
Allan Reid
Dura-Loc Roofing Systems, Inc.

9/23/2003
Share
Or copy this URL: https://www.metalroofing.com/spirit/comment/2264/find/
  • About Us
    • Member Companies
    • Leadership
    • MRA News
    • Homeowner Testimonials
    • Contact the MRA
    • For Professionals
    • Subscribe
  • Why Metal Roofing?
    • Benefits and Performance of Metal Roofing
    • Compare Roofing Materials
  • Homeowner Resources
    • Metal Roofing Buyers Guide
    • Metal Resilient Guide
    • Metal Roof Sustainability Guide
    • Above All Else You Need a New Roof eBook
    • Today’s Homeowner Partnership
    • Metal Roofing Visualizer
    • MRA University
    • Member Provided Resources
    • Frequently Asked Questions
    • Inspirational Metal Roofing Projects
  • Gallery
  • Ask The Experts
    • Energy Efficiency
    • I Have An Existing Metal Roof and Have A Question
    • Metal Roofing Benefits
    • Product Selection
    • Other
    • Archive
©2018 Metal Roofing Alliance. All Rights Reserved. Privacy Policy Terms and Conditions