Or copy this URL:
https://www.metalroofing.com/spirit/comment/2135/find/
Any ideas on how to tie off when working on a site that has a 10/12 roof pitch? The top edge is approximately 30' in the air with flat wall at the top edge so there's nothing to tie into for stability. The bottom edge is about 16' off the ground. We are using 20' panels to do this project. It's like a canopy over a sidewalk. Any suggestions besides hanging from the lanyard at all times?
8/6/2003
8/6/2003