Dormer Flashing to Shingle Junction

Guest User
3/24/2009
My contractor finished my 2 dormer of my standing seam roof where it joints the asphalt shingles in two ways. The first has shingle covering all but 1" of the metal flashing. The second has the shingles held back a full course giving about 8" exposure. The dormers stand side by side. What is the correct treatment?
Todd Miller
Classic Products, Inc.
3/29/2009
It would be best to have the transition shingled over. The difference may be where the dormer was falling in relationship to the shingle tabs.
Find a Contractor

Get Started Today

Take the first step to increasing the value of your home with a great looking, durable, fire resistant and energy efficient metal roof. Browse our list of qualified MRA Member Roofing Contractors in your area for a free consultation and estimate.