I'm installing a metal multi rib roof and nedding info about latheing the valleys. Should I lathe to the center of the valley or should I terminate a inch or so before center?
Or copy this URL:
https://www.metalroofing.com/spirit/comment/10978/find/
It's more a matter of prefernce but I would run lathing parallel to the valley down both sides and the center too. Then butt my lateral lathing into the lathing on each side of the valley.
2/16/2008
NCI Building Systems, Inc.
2/18/2008