This topic has been closed by the administrator. Comments are no longer accepted.
I would like to use a standing seam roof on a house with a 4-12 pitch and a eyebrow dormer. where do I find instructions/examples on how to install the valley? should the metal be running over the curve of the dormer or parallel to the rest of the roof?
Or copy this URL:
https://www.metalroofing.com/spirit/comment/10706/find/
I am adding a quick drawing to show the layout of the eyebrow on the shed dormer on the house. the eyebrow is in blue and the shed dormer is is red. the eyebrow is about 20 feet wide. There is also a barrel vault roof/ceiling on the first floor/right hand side of the house.
Since I am designing the house now I could put a 3:12 slope on the eyebrow and a 4:12 to 5:12 slope on the shed roof, Or I could change this.
1/1/2008
1/1/2008