Guest User
12/18/2006
I'm installing a 5V metal roof on a pole barn. How much overlap is needed for the vertical sheets? The roof is 24 feet wide and 22 feet long so I need either 3 eight foot sheets per run or 2 twelve foot sheets per run.
Allan Reid
Dura-Loc Roofing Systems, Inc.
12/18/2006
I would order full lengthe sheets and get them delivered to the site.Otherwise contact the manufacturer.
Find a Contractor

Get Started Today

Take the first step to increasing the value of your home with a great looking, durable, fire resistant and energy efficient metal roof. Browse our list of qualified MRA Member Roofing Contractors in your area for a free consultation and estimate.