This topic has been closed by the administrator. Comments are no longer accepted.
I want to cover a mini-barn that I'm building with metal roofing, but I'm unsure how to deal with where the pitch changes... Can I use one long piece and bend it where the pitch changes, or do I use two pieces? If I used two pieces, how do I create a leak-proof seam? Any info would be greatly appreciated!
Or copy this URL:
https://www.metalroofing.com/spirit/comment/651/find/
Unless the pitch change is extremely minimal and the metal roof panel you're installing has very little configuration, you will need to stop and re-start the panels at the pitch change, utilizing a pitch change flashing.
The flashing should be bent to the right angle. It should extend up under the higher roof by about 6 inches and then come out, over, and on top of the lower roof for about 4 inches.
5/29/2002
Isaiah Industries, Inc.
5/29/2002