This topic has been closed by the administrator. Comments are no longer accepted.
I am working on a residence to be located in western MA. I plan to use 11 1/2" core SIP panels for the roof with a continuous cathedral ceiling below. The finish roof will be standing seam metal panels.
Other than cost what would be the advantage/disadvantage of placing the metal panels on a layer of sheathing , ( or furring ), separated from the top of the SIP panels by a continuous vented air space?
10/15/2008
Isaiah Industries, Inc.
10/15/2008